Disclosure: Renovation Guide HQ publishes free, independent home improvement guides. We do not earn commissions from the products or services mentioned in this guide, and we have no affiliate relationships.

By Muhammad Haroon · Updated November 11, 2026

Updated: November 2026

Quick Answer

Butcher block countertops cost $1,200 to $5,000 installed for a typical kitchen, with a national average of $3,750, according to Angi. Per square foot, expect $40 to $100 installed, with a national average near $58 per square foot. A standard 30-square-foot kitchen runs $1,200 to $3,000. Most installations take 1 to 2 days once the slab arrives, plus a week of oiling before heavy use.

This guide is part of our Kitchen Renovation cluster. Start with the cluster hub, Kitchen Renovation, and the pillar guide, How Much Does a Kitchen Remodel Cost in 2026?, to see where butcher block fits in a full remodel budget. If you are comparing surfaces, read Quartz vs. Granite Countertops. For the project order, see Kitchen Remodel Timeline, and for an island in butcher block, see Kitchen Island Cost in 2026.

Butcher Block Countertop Cost Table

Every dollar figure with a link comes from that source; anything else is a planning estimate. Wood species is the biggest price driver, and grain direction is the second: end-grain construction costs 30 to 60 percent more than edge grain in both material and labor, per Custom Wood Quote.

ProjectLowAverageHighPer Sq Ft InstalledLabor vs. MaterialsTypical Timeline
Stock edge-grain maple, 30 sq ft kitchen$1,200$1,750$3,000$40 to $65About 35% labor, 65% materials1 to 2 days install, 1 week oiling
Mid-range oak or cherry, 30 sq ft kitchen$1,500$2,500$4,000$50 to $75About 35% labor, 65% materials1 to 2 days install, 1 week oiling
Premium walnut edge-grain, 30 sq ft kitchen$2,000$3,000$5,000$65 to $100About 30% labor, 70% materials2 to 3 days install, 1 week oiling
Custom end-grain, walnut or maple, island or full kitchen$2,500 (planning estimate)$3,750$5,000-plus$70 to $150, custom work up to $200 to $400About 40% labor, 60% materials3 to 5 days install, 2 to 4 weeks lead time
DIY stock slab only, 30 sq ft, no installation labor$750 (planning estimate)$1,050 (planning estimate)$2,100 (planning estimate)$25 to $70 material only0% paid labor, 100% materials, plus your time1 weekend install, 1 week oiling

One warning before you budget: slab prices and installed prices are different numbers, and quotes mix them up. A $35-per-square-foot slab is not a $35 installed countertop. Installation labor typically runs $10 to $30 per square foot, and fabrication, sink cutouts, edge profiles, and delivery sit on top of the slab price. Always ask whether a quote includes templating, cutouts, finishing, and installation, or only the wood.

Butcher Block Cost by Wood Species

Species choice sets your material bill more than anything else. The table below combines published material costs from Custom Wood Quote and installed ranges from SlabWise and Angi.

Wood SpeciesMaterial Cost per Sq FtInstalled Cost per Sq FtHardness and DurabilityBest For
Hard maple, edge grain$25 to $45$45 to $65Excellent, 1,450 on the Janka hardness scaleEveryday working counters, the industry standard
Red oak$15 to $50$50 to $75High, but open grain traps moisture if poorly finishedRustic or classic kitchens on a budget
White oak$35 to $60$55 to $80 (planning estimate)Excellent, denser than red oakHigh-end look at 30 to 40 percent less than walnut
Cherry$35 to $65$60 to $90 (planning estimate)Good, darkens beautifully with ageWarm, reddish tones in traditional kitchens
Walnut, edge grain$50 to $90$65 to $100Very good, softer than maple, dents more easilyDark feature islands and modern kitchens
End-grain maple or walnut$55 to $90$70 to $150Exceptional, the classic chopping-block buildShowpiece islands and serious prep surfaces

Hard maple is the safest all-around choice for a working kitchen: it is hard, dense, light in color, and the most affordable hardwood option. Walnut is the look people photograph, but it costs 40 to 60 percent more than maple and shows dents sooner, so many homeowners put walnut on the island and maple on the perimeter counters. White oak is the smart middle ground, delivering a similar high-end look to walnut at 30 to 40 percent lower material cost, per Custom Wood Quote.

Know the grain before you buy. Edge grain is made from long strips glued face to face and shows a clean linear pattern; it is what most stock slabs are. End grain is built from short blocks standing on end, the classic butcher-block look, and it costs 30 to 60 percent more because it takes more material and more labor. Face grain shows the wide face of the planks with broad grain and knots; it looks beautiful in walnut and oak but moves more with moisture changes, so it is less common for full counters.

Worked Budget Example: A 30-Square-Foot Kitchen in Edge-Grain Maple

Take a standard kitchen with 30 square feet of countertop, one sink cutout, and one cooktop cutout. A professional fabricator supplies a stock edge-grain maple slab, cuts it to fit, and installs it. Every line item uses a sourced figure or a labeled planning estimate, and the math adds up.

Maple slab, 30 sq ft at $35 per sq ft: $1,050. That sits in the middle of the $25 to $70 per square foot material range SlabWise reports.

Fabrication, sink and cooktop cutouts plus eased edge: $450. Planning estimate. Cutouts and edge profiles are the fabrication work most quotes forget to itemize.

Installation labor: $600. Planning estimate, at $20 per square foot, inside the $10 to $30 per square foot labor range SlabWise reports.

Food-safe oil finish, first 5 coats plus supplies: $75. Planning estimate. Food-grade mineral oil costs about $8 a bottle at any pharmacy, per SlabWise, and a new top needs 5 to 7 coats in its first week.

Delivery: $100. Planning estimate. Slabs are heavy and awkward, and delivery is often a separate line.

Total: $2,275. Add it up: $1,050 plus $450 plus $600 plus $75 plus $100 equals $2,275. That sits inside the $1,200 to $3,000 range SlabWise reports for a standard 30-square-foot kitchen, and well under the $3,750 national average Angi reports, because this example uses stock maple rather than custom walnut. Swap maple for walnut and the same kitchen lands near $3,000 to $3,500.

What the $2,275 does not include: removing and hauling away the old countertop, which runs $100 to $300 as a planning estimate; plumbing work to reconnect the sink and faucet; or any cabinet repairs found once the old top comes off. Ask your fabricator whether tear-out and haul-away are included before you sign.

What $1,200, $2,275, and $5,000 Actually Buy

$1,200 buys a DIY stock maple slab for a small kitchen or a single run of counter, installed by you, with a basic oil finish. It buys no fabrication help, no sink cutout service, and no warranty on the install. It is the right budget for a handy homeowner with a straight run of counter and no cutouts.

$2,275 buys a professionally installed stock edge-grain maple kitchen, 30 square feet, with sink and cooktop cutouts, an eased edge, and the first oil finish applied. This is the sweet spot: real wood, professional fit, and a price roughly half of entry-level quartz for the same footprint.

$5,000 buys a custom end-grain walnut kitchen or a large kitchen with an island, with premium edge profiles, a hardwax oil or tung-oil finish, and professional installation. Above this level, you are paying for exotic species, waterfall ends, or a high-cost city, not for a better countertop.

Regional Differences

Wood costs about the same everywhere in the United States, because slabs ship nationally and lumber is a commodity. Labor is where regions split, and labor is 30 to 40 percent of an installed bill. The ranges below are illustrative planning estimates built from published national ranges and typical trade wage differences, not quotes. Always get three local quotes before you commit.

RegionInstalled, 30 Sq Ft Maple KitchenWhat Drives the Difference
Northeast and West Coast metros$2,200 to $3,800 (planning estimate)Highest installer rates, longer lead times for custom work, more permit and scheduling friction
Midwest and Southeast$1,500 to $3,000 (planning estimate)Near the national average; competitive fabricator labor and shorter lead times
South Central and rural areas$1,200 to $2,500 (planning estimate)Lowest installer rates; stock slabs readily available at big-box stores

One regional factor has nothing to do with wages: humidity. Wood moves with moisture, and a butcher block installed in a dry winter in Arizona behaves differently from one installed in a humid summer in Florida. A good installer acclimates the slab in your home for several days before cutting, and leaves room for seasonal expansion. Ask your installer how they handle acclimation and expansion gaps in your climate, not just what the job costs.

7 Cost Factors, With the Dollar Impact of Each

1. Wood species: $750 to $4,500 on a 30-square-foot kitchen. This is the biggest driver. Maple material runs $25 to $45 per square foot; walnut runs $50 to $90. On 30 square feet, that species choice alone swings the material bill by $750 to $1,350, and the installed total by more.

2. Grain direction: $500 to $1,500. End grain costs 30 to 60 percent more than edge grain in material and labor, per Custom Wood Quote. On a $2,275 maple kitchen, switching to end grain adds roughly $700 to $1,400.

3. Thickness: $300 to $900. Standard slabs are 1.5 inches thick. Thicker 2-inch or 2.25-inch tops cost more in lumber and look more substantial, and end-grain tops often run 2 to 3 inches. Expect a thicker top to add $10 to $30 per square foot as a planning estimate.

4. Size and cutouts: $200 to $800. Every sink, cooktop, and faucet cutout is fabrication work. A kitchen with one sink cutout is a simple job; add a cooktop cutout, a farmhouse sink apron, and an undermount sink, and fabrication climbs fast. Budget $100 to $300 per cutout as a planning estimate.

5. Edge profile: $100 to $400. A simple eased edge is often included. Ogee, bullnose, and waterfall edges cost more in shop time, and a waterfall end, where the wood runs down the side of an island, can add $300 or more as a planning estimate.

6. Finish choice: $75 to $600 up front, plus yearly upkeep. Food-grade mineral oil costs about $8 a bottle and needs monthly reapplication in the first year. A hardwax oil finish costs more up front, $150 to $400 as a planning estimate, but needs a maintenance coat only every 1 to 2 years. A tung-oil resin finish such as Waterlox costs $200 to $600 as a planning estimate and needs a recoat every 2 to 5 years, per SlabWise.

7. Installation and tear-out: $300 to $900. Installation labor runs $10 to $30 per square foot. Tear-out and haul-away of the old countertop is often a separate $100 to $300 line, and reconnecting plumbing adds more if a plumber is needed. DIY installation saves the labor, but a bad cut or a dropped slab costs far more than the labor saved.

The 10-Year Cost: What Butcher Block Really Costs to Own

Most cost guides stop at installation. Butcher block is the only common countertop material with a real maintenance bill, so the 10-year total is the honest comparison. The figures below are planning estimates built from the finish schedules SlabWise publishes.

FinishUp-Front Finish CostMaintenance Schedule10-Year Maintenance Cost10-Year Total on a $2,275 Kitchen
Food-grade mineral oilAbout $75Monthly the first year, then every 1 to 3 months$150 to $300$2,425 to $2,575
Mineral oil and beeswax blend$100 to $150Every 1 to 3 months$150 to $300$2,425 to $2,575
Hardwax oil$150 to $400Maintenance coat every 1 to 2 years$100 to $300$2,375 to $2,575
Tung-oil resin, Waterlox type$200 to $600Recoat every 2 to 5 years$100 to $300$2,375 to $2,875
Polyurethane film$150 to $400Recoat every 3 to 7 years, full strip when it wears$200 to $500$2,475 to $2,775

The surprise is that the cheapest finish is not much cheaper over 10 years than the durable ones. Mineral oil costs little per bottle but demands your time every month; hardwax oil and tung-oil resin cost more up front and ask far less of you later. Add one professional refresh, about $400 for two visits over a decade in one published Denver comparison, and a $1,350 butcher block island still totals about $1,750 all-in over 10 years, per Denver Mode, roughly half the cost of the same island in quartz. The real cost of butcher block is not money. It is attention.

DIY vs. Hiring a Pro

Butcher block is one of the most DIY-friendly countertop materials, because wood cuts with ordinary tools and mistakes sand out. It is also one of the easiest to ruin with a bad measurement or a wet sink. Here is the honest split.

FactorDIYProfessional
Skill level, 1 to 53, comfortable with a circular saw, router, and sanderNot your problem, but check their portfolio for wood work specifically
Tools neededCircular saw with fine blade, router, random orbital sander, clamps, straightedge, drillShop tools, templating equipment, and a spray or wipe-on finish setup
Time1 weekend to install, plus 1 week of daily oiling1 to 2 days to install, plus the same week of oiling
Typical savings$300 to $900 in labor on a 30-square-foot kitchen, at $10 to $30 per square footNone, but you get a warranty and a clean sink cutout
Best forStraight runs, stock slabs, no sink or cooktop cutoutsCutouts, seams, islands, end grain, and any kitchen with an undermount sink

DIY is a good call when the run is straight, the slab is stock, and there are no cutouts. Hire a pro when the job includes a sink cutout, a seam, an L-shape, or an island, because a cutout in the wrong place ruins a $1,000 slab. Electrical and gas work are always pro jobs: moving a cooktop, a range, or an outlet needs a licensed electrician or gas fitter, and most jurisdictions require a permit for that work even when the countertop swap itself needs none. Plumbing reconnection after a sink move is also pro work in most homes.

Step-by-Step: Installing Butcher Block Countertops

Step 1: Measure and template, 2 to 4 hours. Measure the cabinet run twice, mark the sink and cooktop positions, and note every wall that is not square. For a pro job, the fabricator makes a physical template. For DIY, make a cardboard or plywood template and test-fit it before you cut wood.

Step 2: Order the slab, 1 to 4 weeks lead time. Stock maple slabs are available at big-box stores and ship in days. Custom walnut or end-grain slabs take 2 to 4 weeks from a fabricator. Order 5 to 10 percent extra length for cut mistakes and end trimming.

Step 3: Acclimate the slab, 3 to 7 days. Stand the slab in the kitchen where it will live, out of its packaging, so it adjusts to your home’s humidity. Skipping this step is the most common cause of gaps and warping later.

Step 4: Cut to size and cut the openings, 3 to 6 hours. Cut the slab to length with a fine-tooth circular saw, then rout the sink and cooktop cutouts. Cut sink openings slightly small and sneak up on the fit; you cannot add wood back. Seal every cut edge immediately.

Step 5: Dry-fit and scribe, 1 to 2 hours. Set the slab on the cabinets, check it against the walls, and scribe any wall that is out of square. Trim to fit. Check the overhang: a standard overhang is 1 to 1.5 inches past the cabinet face, and 12 inches where people sit at an island.

Step 6: Seal the underside and cut edges, 1 hour plus drying. Oil or seal all six sides, including the bottom and every cut edge. Wood that is sealed on top and bare underneath warps. This is the step most DIY jobs skip, and the one that causes the most callbacks.

Step 7: Fasten the slab, 1 to 2 hours. Secure the slab with screws up through the cabinet stretchers into the wood, using slotted holes or figure-eight fasteners that let the wood expand and contract. Never glue a butcher block slab solid to the cabinets; seasonal movement will crack it or pull the cabinets apart.

Step 8: Finish the top, 1 week of short sessions. Apply food-grade mineral oil once a day for 5 to 7 days on a new surface, per the guidance SlabWise reports from the American Hardwood Export Council. Let each coat soak 20 to 30 minutes, wipe off the excess, and let it cure 24 hours before heavy use. If you chose a hardwax oil or tung-oil resin instead, follow the manufacturer’s cure time, at least 72 hours for Waterlox-type finishes.

Step 9: Reconnect the sink and faucet, 1 to 3 hours. Set the sink, seal the rim, reconnect the faucet and drain, and check for leaks. A plumber is the safe call here if the sink moved or the drain height changed. Do the water test before you call the job done: run the faucet, fill the sink, and watch every joint.

Total time: 1 to 2 days of active work for a pro crew, or one weekend plus a week of oiling for a DIY job, on a standard 30-square-foot kitchen.

Choosing a Finish: Food-Safe vs. Sealed

The finish decides how much work the counter asks of you, and whether you can cut food directly on it. The table below follows the finish comparison SlabWise publishes.

FinishFood-SafeMaintenanceWater ResistanceBest Use
Pure mineral oilYes, FDA affirmed as safe for incidental food contactMonthly, first year, then every 1 to 3 monthsLow, water rings and darkens near the sinkActive prep surfaces you cut on daily
Mineral oil and beeswax blendYesEvery 1 to 3 monthsModeratePrep surfaces, warmer appearance
Hardwax oilYes after full cureEvery 1 to 2 yearsGoodHigh-traffic counters with some water exposure
Tung-oil resin, Waterlox typeYes after full cure, 72 hours minimumEvery 2 to 5 yearsVery goodCounters near sinks and island tops
PolyurethaneNot for direct food contactEvery 3 to 7 years, full strip when it wearsExcellentDecorative counters, bars, non-prep islands

The rule is simple: if you plan to cut food directly on the counter, use an oil or oil-wax finish and accept the monthly oiling. If the counter sits beside the sink or under a dish rack, use a tung-oil resin or hardwax oil for real water resistance. Never use cooking oils such as olive or vegetable oil; they go rancid and turn sticky. And never oil over a film finish such as polyurethane; oil cannot soak through a cured film, so it just sits greasy on top.

Materials and Tools List

Materials: butcher block slab in your species and thickness, food-grade mineral oil or your chosen finish, 120-grit and 220-grit sandpaper, silicone sealant for the sink rim, wood screws and figure-eight fasteners, mineral spirits for cleanup, lint-free cloths.

Tools: tape measure, straightedge, circular saw with a fine-tooth blade, router with a flush-trim bit, random orbital sander, drill and driver, clamps, level, caulk gun, safety glasses, and hearing protection.

For a pro job, ask the fabricator to supply: the slab, the finish, the fasteners, and the sink mounting hardware, so there is one party responsible if the fit or the finish fails.

9 Mistakes That Ruin Butcher Block Counters

1. Skipping acclimation. A slab cut the day it arrives will shrink or swell in your kitchen and open gaps at the seams. Let it sit in the room for 3 to 7 days first.

2. Sealing only the top. Wood sealed on one side and bare on the other warps. Oil or seal all six sides, including the underside and every cut edge, before installation.

3. Gluing the slab solid to the cabinets. Wood moves with the seasons. Screws through slotted holes or figure-eight fasteners let it move; glue and tight screws do not, and the top will crack or pull the cabinets apart.

4. Putting an oiled top beside the sink with no plan. Standing water is the enemy of an oil finish. Bare or lightly oiled wood soaks up water, darkens around the sink, and rings under wet glasses. Use a tung-oil resin finish near the sink, or wipe up water the same day, every day.

5. Oiling once and forgetting it. A new top needs 5 to 7 coats in its first week, then monthly oiling for the first year. The water test tells you when to re-oil: if a few drops absorb within 30 seconds, the wood is thirsty.

6. Using cooking oil as a finish. Olive oil and vegetable oil oxidize, turn sticky, and smell off. Only food-grade mineral oil or a purpose-made butcher block conditioner belongs on a counter.

7. Cutting the sink opening too big. A sink cutout that is a quarter inch too wide cannot be fixed. Cut small, test the fit, and trim in small passes.

8. Ignoring the overhang. Too little overhang looks wrong and lets drips run down the cabinet faces. Too much overhang without support sags or snaps. Keep 1 to 1.5 inches on the working sides and support any seating overhang over 12 inches.

9. Choosing walnut for a heavy-chopping station. Walnut is softer than maple and dents sooner. Put the beautiful wood on the island where people look at it, and the hard maple where the knives live.

Permits and Safety

A straight countertop swap usually needs no permit, because you are not changing structure, plumbing, or wiring. You need a permit and a licensed pro when the job moves a sink, a cooktop, a gas line, or an outlet, or when it changes the cabinet layout in a way that touches structure. Check with your local building department before you start, because rules vary by city and county.

Safety notes: wear eye and hearing protection when cutting and routing, and support the slab fully so it cannot tip or pinch the saw blade. If the old countertop is being removed from a home built before 1978, follow EPA RRP lead-safe practices for any painted surfaces you disturb, and test for asbestos in pre-1980 materials such as old mastic or backing before you sand or cut them. Mineral oil rags are low risk, but rags soaked in drying oils such as tung oil can self-heat, so lay them flat to dry outdoors and never pile them in a closed bin.

Financing a Butcher Block Countertop

Most butcher block jobs are small enough to pay cash, but a full kitchen in walnut or end grain can reach $5,000, and a whole-kitchen remodel around it can reach far more. Four common ways homeowners pay for renovation work, in general terms: a home equity line of credit, which lets you draw what you need as the work progresses; a home equity loan, which gives one lump sum with fixed payments; a cash-out refinance, which replaces your mortgage with a larger one and takes the difference in cash; and a personal loan, which is faster to arrange but usually carries a higher rate and a shorter term. No specific rates are quoted here, because rates change daily and depend on your credit and your lender. The practical rule is to match the loan to the job: a $2,000 countertop is rarely worth a refinance, while a $30,000 kitchen is rarely worth a personal loan. Talk to your bank or credit union before you sign a contractor’s contract, and never let a contractor arrange financing for you without comparing it to your own bank’s offer.

How to Hire a Contractor for Butcher Block

Get three quotes, and make sure each one lists the species, the grain, the thickness, the edge profile, the finish, and whether tear-out, cutouts, and installation are included. Then ask these six questions.

1. What species and grain are you quoting, and is the slab stock or custom? A quote that says only “butcher block” can hide a species swap. Maple and walnut differ by thousands of dollars on a full kitchen.

2. How do you acclimate the slab, and how long does it sit in my home before cutting? The right answer is several days in the room. A fabricator who cuts the day the slab arrives is cutting corners.

3. What finish do you apply, and is it food-safe for direct cutting? If you plan to chop on the counter, the finish must be food-safe when cured. Get the product name in writing.

4. How do you fasten the top so it can expand and contract? The right answer is screws through slotted holes or figure-eight fasteners. Glue or tight screws are a red flag.

5. What is the warranty on the installation, and what does it cover? A real warranty covers seams, fastening, and finish failure for at least a year. Verbal promises do not count.

6. Can I see two recent butcher block jobs and talk to those homeowners? Wood work is a specialty. A fabricator with no recent butcher block portfolio is learning on your kitchen.

Red flags: a quote with no species named, a price far below the $40-per-square-foot installed floor, no mention of acclimation or sealing the underside, pressure to sign today, and no written warranty. Verify any license through your state contractor license board, and check the business with your state attorney general’s office for complaints before you pay a deposit. Never pay more than 10 to 20 percent up front, and never pay the final balance until the sink is reconnected, the finish is cured, and you have done the water test yourself.

Frequently Asked Questions

How much does a butcher block countertop cost per square foot? Expect $40 to $100 per square foot installed in 2026, with a national average near $58. Material alone runs $25 to $70 per square foot, and installation labor adds $10 to $30 per square foot. Maple sits at the low end and custom end-grain walnut at the high end.

Are butcher block countertops worth it? For the right kitchen, yes. They cost roughly half of quartz for the same footprint, they can be sanded and refinished instead of replaced, and they add warmth no stone can match. They are not worth it if you will not oil them, because an unoiled top stains, cracks, and warps. The honest test is your own habits: if monthly maintenance sounds fine, buy the wood.

How often do you have to oil butcher block countertops? A new top needs oil once a day for 5 to 7 days, then monthly for the first year, then every 1 to 3 months after that, or whenever water stops beading on the surface. Hardwax oil finishes need a maintenance coat only every 1 to 2 years, and tung-oil resin finishes every 2 to 5 years, per SlabWise.

Can you cut directly on a butcher block countertop? Yes, if the finish is food-safe, such as mineral oil or an oil-wax blend. Food-grade mineral oil is affirmed as safe by the FDA for incidental food contact. Do not cut directly on a polyurethane finish, and do not cut acidic foods such as lemons on an oiled surface for long stretches, because the acid can mark the wood.

Do butcher block countertops work next to a sink? They can, but the sink is the riskiest spot in the kitchen for wood. Standing water darkens oiled wood and can cause warping. Use a tung-oil resin or hardwax oil finish near the sink, wipe up splashes the same day, and never let a dish rack sit and drip in one spot. An undermount sink needs a good seal at the rim and a fabricator who has done them in wood before.

How long do butcher block countertops last? Decades, with care. Scratches sand out with 120-grit paper and a fresh coat of oil, and a top that looks tired can be fully refinished rather than replaced. What shortens the life is neglect: no oiling, standing water, and unsealed cut edges. A well-kept maple top can outlast the cabinets under it.

Bottom Line

Butcher block is the best-value wood countertop you can buy: $1,200 to $5,000 installed for a typical kitchen, about half the price of quartz, with a look and a warmth no stone matches. Choose hard maple for a working kitchen, walnut for a feature island, and a tung-oil resin finish if the counter sits near the sink. Budget for the oiling habit as honestly as you budget for the slab, because the finish is the difference between a counter that lasts decades and one that warps in two years. Get three quotes, compare them per square foot installed with the species named, and pick the fabricator who talks about acclimation and sealing the underside before they talk about price.

Ready to price your kitchen? Get 3 free quotes from local pros through our contact page, and tell them the species, grain, and finish you want so every quote is for the same job. For the full remodel picture, start with Kitchen Renovation and How Much Does a Kitchen Remodel Cost in 2026?